The Workdry Group

Case studies from across our group

Industrial Siltbuster

From Fragile to Future-Proof: Moderinsing Wastewater Treatment at Aberlour Distillery

See how a phased DAF and MBBR20 Siltbuster solution upgraded Aberlour Distillery's ageing and fragile wastewater treatment process.

Read more
Siltbuster HB50MR Units at Shoreham Wastewater Treatment Works
Water Selwood Siltbuster

Delivering integration: A Two-Phase Bypass and Wastewater Treatment Solution

Southern Water engaged Selwood and Siltbuster to support a programme of planned maintenance and repair works on key assets at the treatment works.

Read more
Selwood pumps supporting with emergency pumping at Llangollen Canal over Christmas 2025
Water Selwood

Emergency pumping support at Llangollen Canal

Selwood was tasked to deploy a mission-critical pumping system following a significant embankment breach on the Llangollen Canal over the Christmas period in 2025.

Read more
Infrastructure Siltbuster

Engineering Clarity: Bespoke Water Treatment for a National Logistics Hub

See how Siltbuster stepped in at a £2bn UK logistics hub to replace a failing water treatment system and support strict Net-Zero environmental compliance.

Read more
Infrastructure Siltbuster

Major UK road upgrade

Siltbuster’s specialists are supporting the principal contractor of a major UK road schemes, ensuring the project stays in consent while significant earth-moving works are carried out.

Read more
Infrastructure Siltbuster

M27 J4-J11 remedial works

Siltbuster’s infrastructure water treatment specialists were approached by Morgan Sindall Infrastructure to support with a water treatment system for concrete removal works on a major motorway project in Hampshire.

Read more
Infrastructure Siltbuster Selwood

HS2 – G2S South and Central Sections

Siltbuster’s infrastructure water treatment specialists are supporting civil engineering joint venture EKFB with water treatment systems at its sites along the HS2 high-speed railway project.

Read more
Infrastructure Siltbuster

Pipe flush using the HB150

Siltbuster responded rapidly to an urgent callout to a hydro-electric power generating facility in North Wales.

Read more
Infrastructure Selwood

Critical Support at Scale: On-Site Solutions at Hinkley Point C

Hinkley Point C, the landmark nuclear power station being built in Somerset by EDF Energy, is one of the most significant infrastructure projects the UK has ever seen.

Read more
Water Selwood Siltbuster

Quarry - water discharge

Due to a spell of heavy rain, the client’s quarry had badly flooded, and the bunds for various settlement areas had been washed away.

Read more
Water Selwood

Gate replacement of Forth and Clyde canal

Selwood was tasked with providing a pumping solution to support Mackenzie Construction in delivering a gate replacement on the Forth and Clyde Canal East Reach.

Read more
Water Selwood

Ladybower Reservoir Hope Valley

Selwood was approached by Severn Trent Water to provide an over pumping solution from Ladybower Reservoir to the Yorkshire Water distribution main.

Read more

Connect with our experts

Have a chat with our experts and discover how The Workdry Group can support you — no matter the scale or complexity