From Fragile to Future-Proof: Moderinsing Wastewater Treatment at Aberlour Distillery
See how a phased DAF and MBBR20 Siltbuster solution upgraded Aberlour Distillery's ageing and fragile wastewater treatment process.
Read more
Delivering integration: A Two-Phase Bypass and Wastewater Treatment Solution
Southern Water engaged Selwood and Siltbuster to support a programme of planned maintenance and repair works on key assets at the treatment works.
Read more
Emergency pumping support at Llangollen Canal
Selwood was tasked to deploy a mission-critical pumping system following a significant embankment breach on the Llangollen Canal over the Christmas period in 2025.
Read more
Engineering Clarity: Bespoke Water Treatment for a National Logistics Hub
See how Siltbuster stepped in at a £2bn UK logistics hub to replace a failing water treatment system and support strict Net-Zero environmental compliance.
Read more
Major UK road upgrade
Siltbuster’s specialists are supporting the principal contractor of a major UK road schemes, ensuring the project stays in consent while significant earth-moving works are carried out.
Read more
M27 J4-J11 remedial works
Siltbuster’s infrastructure water treatment specialists were approached by Morgan Sindall Infrastructure to support with a water treatment system for concrete removal works on a major motorway project in Hampshire.
Read more
HS2 – G2S South and Central Sections
Siltbuster’s infrastructure water treatment specialists are supporting civil engineering joint venture EKFB with water treatment systems at its sites along the HS2 high-speed railway project.
Read more
Pipe flush using the HB150
Siltbuster responded rapidly to an urgent callout to a hydro-electric power generating facility in North Wales.
Read more
Critical Support at Scale: On-Site Solutions at Hinkley Point C
Hinkley Point C, the landmark nuclear power station being built in Somerset by EDF Energy, is one of the most significant infrastructure projects the UK has ever seen.
Read more
Quarry - water discharge
Due to a spell of heavy rain, the client’s quarry had badly flooded, and the bunds for various settlement areas had been washed away.
Read more
Gate replacement of Forth and Clyde canal
Selwood was tasked with providing a pumping solution to support Mackenzie Construction in delivering a gate replacement on the Forth and Clyde Canal East Reach.
Read more
Ladybower Reservoir Hope Valley
Selwood was approached by Severn Trent Water to provide an over pumping solution from Ladybower Reservoir to the Yorkshire Water distribution main.
Read more